86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Dongying Wanbao Boiler Equipment Co.,LTD

Products >> The WB-YZG shipborne high pressure steam injection

The WB-YZG shipborne high pressure steam injection

Build Your Online Product Catalogs?



Description
Product Name: The WB-YZG shipborne high pressure steam injection
Supply Ability:
Related proudcts steam boiler, china boiler,
Specifications WB-YZG
Price Term:
Port of loading:
Minimum Order
Unit Price:

Shipborne WB-YZG high-pressure steam injection unit meets the requirements of marine oil exploration and acquisition, which developed to deep, large-scale, intensive, intelligent and environment-friendly.
The new high pressure steam injection unit with three-pass modular integration.
WB-YZG high-pressure steam injection unit is special equipment to produce viscous oil, injecting the produced high temperature and pressure wet steam into wells to heat the crude oil and lower its viscosity, so that it can increase the mobility of heavy oil and its recovery rate greatly. Therefore, the unit is widely used in the production of heavy and super-heavy oil with sophisticated technology, which has strong supports for producing high-yielding and high-quality oil.
WB-YZG high-pressure steam injection unit with three-pass modular integration, a new generation of acquisition equipment of heavy oil, increases efficiency of exploiting heavy oil.
The auxiliary device equips with a water treatment system which can provide qualified softening and deoxidizing water for the unit; the secure device equips with raw water and fuel storage and power control systems which can ensure the unit to run continuously and normally.
The operation is controlled precisely by full-automatic control system, moreover, the safety of unit is ensured by safety warning protection device and one-key-stop method.
WB-YZG high-pressure steam injection unit innovate traditional one-pass design to three-pass which increases 6.2% thermal efficiency, and obtains significant R&D achievements.
The first pass of the unit is laid in the middle of main body, and the furnace adopts membrane wall heating, so the coil bundle of water vapor heated evenly; the second pass is laid on the sides of the first one, using blank casing at front and finned tube at rear, staggered arrangement, stack gas brushes breadthwise, and the medium exchanges the heat in reverse flow so that it can increase endothermic performance of water vapor coil bundle and heat transfer efficiency

Contact Us
Company: Dongying Wanbao Boiler Equipment Co.,LTD
Contact: Mr. Stone Lee
Address: Dongying Economic development zone,Shandong,China,
Postcode: 257001
Tel: 865467171900
Fax: 865467171900
E-mail:         


Copyright© Dongying Wanbao Boiler Equipment Co.,LTD All Rights Reserved.
Tel : 865467171900 Fax : 865467171900
Powered by 86exporter.com